CFC Reduction in HVAC&R Equipment - All old heating, ventilation, air conditioning and refrigeration equipment was removed from the original building. No CFC-refrigerant equipment is located in the renovated or new portion of the building. Cooling equipment is located in a recently constructed central campus cooling plant.

Optimized Energy Performance - The design energy costs are 30% lower than a base line design. Savings were achieved through reducing internal loads and gains through building shell and lighting improvements, and improved efficiency of the building HVAC systems.

Ozone Depletion - No base building HVAC and refrigeration equipment or fire suppression systems installed in the building contain HCFC's and Halon. Cooling equipment is located in a recently constructed campus central cooling plant and only water based fire protection systems are installed in this building.

Library Home Furman University Libraries Furman Home Click here to locate Furman through Mapquest.com Footer