James B. Duke Library Expansion and Renovation

Construction Photos (click on image to enlarge)
- Allow cursor to hover over thumbnail images for descriptive text

December 12, 2003

The Library's front porch has become a temporary storage facility for the new air ducts

View of fountains and Chapel through a metal air duct on the front porch

The rain from the last few days has resulted in rather muddy conditions in the construction area

With the third floor and its ceiling now gone, one can see directly into the attic where the new HVAC system is located

Piles of rubble litter the second floor after the removal of the concrete border that surrounded the third floor

Panoramic view of second floor from southeastern corner

If using Microsoft Internet Explorer v6.0, click here for instructions on how to revert images to their original size for panoramic views.


Home
Events
Vital Stats
Scrapbook