James B. Duke Library Expansion and Renovation

Construction Photos (click on image to enlarge)
- Allow cursor to hover over thumbnail images for descriptive text

July 14, 2003

Dr. Kazee and Dr. Bandelin look over the building plans for the new wing

Dr. Kazee and Dr. Bandelin discuss the design of the atrium area

The grid for the dropped ceiling and the overhead lighting have been installed on the main floor

Network cables are being run above the dropped ceiling

This worker puts the finishing touches on recently installed sheetrock

View of the atrium window from above (note the panes of purple-tinted glass)


Home
Events
Vital Stats
Scrapbook