James B. Duke Library Expansion and Renovation

Construction Photos (click on image to enlarge)
- Allow cursor to hover over thumbnail images for descriptive text

May 9, 2003

From the second floor you can see the central staircase that juts out into the atrium area

Frontal view from the bottom of the central staircase

The second floor is littered with ductwork which is waiting to be installed

An interior close-up of the top of one of the window bays shows the fire-retardant material that protects the steel frame

A bricklayer works on the roof as tar is being prepared in the background

A view of the boundary between the existing building and the new wing

Interesting view of the curved roof on the back of the new wing

A rust-colored sealant is applied to the interior lining of the outside walls before they are bricked in

Here you can see the silhouette of a construction worker as he wades through water that has accumulated from recent heavy rains

A view down the center of one of the side staircases