James B. Duke Library Expansion and Renovation

Construction Photos (click on image to enlarge)
- Allow cursor to hover over thumbnail images for descriptive text

April 22, 2004

The new windows for the south wall of the original building can be seen in the background of this picture

The main level door to the new elevator will be right next to the Research Assistance Desk

A wheelchair lift is being installed on the second floor to allow access to the Pitts Room

All of the crown molding has been mounted in the second floor lobby

Library staff will be able to greet researchers from a reception window at the entrance to Special Collections and Archives

Going down?

The new, slightly modified entrance to the Pitts Room