James B. Duke Library Expansion and Renovation

Construction Photos (click on image to enlarge)
- Allow cursor to hover over thumbnail images for descriptive text

February 25, 2004

All of the window frames have been installed on the west side of the new wing

Heavy equipment has been brought in to excavate on the south side of the Library

Lots of earth is being removed to make way for windows on the lower level

Another view of the excavation

New windows have been installed in the front of the Library

More new windows

Workers are busy constructing the new Circulation area

New group study rooms are being framed in along the front of the Library

With its ceiling removed and its hardwood floor covered for protection, the Pitts Room does not look quite so elegant and stately

A view down the new elevator shaft from the second floor